life: building projects: 3  

Pictures from September and October:

up to velux

the whole structure is insulated now. We placed all the roof beams and wall studs at 395mm centres so that the fibreglass would fit in snugly without cutting.

front with glass in

The front window makes it finally water-tight. the idea was lots of glass facing south to provide as much natural heat as possible.

looking forward

looking back roof

looking back

this place, right at the back, will eventually be the sauna

sauna

to see pictures from December click here

 

dotsHome page

Work: journals: nursing :news : cv : dissemination
Life: building : motorbiking : links
 
Contact me :
dotsBack
 
obliquepanic