Pictures from September and October:
the whole structure is insulated now. We placed all the roof beams and
wall studs at 395mm centres so that the fibreglass would fit in snugly
without cutting.
The front window makes it finally water-tight. the idea was lots of glass
facing south to provide as much natural heat as possible.
this place, right at the back, will eventually be the sauna
to see pictures from December click here |